FUTURE PROJECTS

On the Boards

Completed projects

The following projects were completed in 2015.

Redfoot Road Bridge - (County Bridge 1416) - This project was constructed by Shingledecker's Welding. It was funded under the State Transportation 12 year program

Elliott Road Bridge - (County Bridge 2706) - This structure is a bridge preservation project consisting of a deck and barrier replacement. This project was constructed by Shingledecker's Welding. It was funded with Act 44 funds

Campground Road Bridge - (County Bridge 2810) - This project was constructed by Shingledecker's Welding. It was funded under the State Transportation 12 year program using Act 13 SD bridge funds.

Freeland Road Streambank Stabilization - (County Bridge 908) - This project was constructed by R&B Contracting. It was funded under using Act 13 greenways funds.

Projects in Design

The following projects are anticipated in 2016.

Bridge Preservation Projects - (Various County Bridges) - Eleven Bridge preservation projects will be grouped under one project.  The project is anticipated for a February 2016 letting with construction in 2016. To be funded with Act 44 funds.

Race Street Bridge - (County Bridge 802) - The existing bridge was built in 1921. The firm of MS Consultants is the design consultant. The bridge is projected for an April, 21 2016 construction letting, and is expected to take two construction seasons with completion in 2017. It is funded under the State Transportation 12 year program with the local match from Act 89 funds.

Oak Hill Road Bridge - (County Bridge 2809) - SAI is the design consultant.  The project is anticipated for an April 21, 2016 letting with construction in 2016. It is funded under the State Transportation 12 year program with the local match from Act 89 funds.

Walnut Street Bridge - (County Bridge 1704) - This project is being designed in-house. The project is anticipated to be let in the fall of 2016 for construction in 2017. It is funded under the State Transportation 12 year program with the local match from Act 89 funds.

The following projects are anticipated to be under construction once designs are completed in the next several years, and as funds are made available under the State 12 year Transportation program.

Year 2017 and beyond

Kelly Road Bridge - (County Bridge 2304) - This structure is closed and the parallel bridge is posted for a 27-ton weight restriction, and is the only access to the Shenango Dam and recreation area. The firm of Gannett Fleming has been selected for design of the project. Preliminary design is progressing. The mitigation and draft MOA for the adverse effect to this historic structure is being coordinated with FHWA.

Parker Road Bridge - (County Bridge 2116) - LR Kimball is the design consultant.  The project is in final design.

Ohl Street Bridge - (County Bridge 803) - The existing bridge was built in 1909 and is currently closed. The firm of HDR has been selected for the design of this project. The preliminary design is progressing.  A supplement to the rehabilitation feasibility report considering a hybrid structure is under preparation for submission to the Pennsylvania Historical and Museum Commission. HDR has brought Michael Baker in as a sub-consultant to prepare a Least Overall Harm Analysis as required by FHWA.

Mill Road Bridge - (County Bridge 1015) - This project consists of replacement of an 1885 era structure that currently carries a 4 ton weight restriction. The firm of SAI has been selected for design of this project. The preliminary design is progressing. The Rehabilitation Feasibility Study was submitted to FHWA. Comments from the review are being addressed.

Other Projects

Bridge Closure and Removal Study Mercer County undertook a study to identify operationally redundant bridges that may be candidates for closure and removal.  This study will help identify how best to direct limited resources.  The study was completed in January, 2015. See the detail links on our home page. Since completion of the study, two bridges were transferred to township ownership and one was abandoned.

 

 